The Construction Source

projectors and screens​. They were also responsible for grounds maintenance, which meant: winter snow removal; salt and sanding the parking lots; site roads and laydowns; walkways; stairs and landings; and 22 kilometres of overland belt roadway. Additionally, they filled potholes, graded the site; graded 22 kilometres of overland belt roadway; and were responsible for mowing and weed management. They also performed water control and ditch maintenance; excavations and trenching as needed; they planted and watered over 300 trees; and they did general cleanup and organizing around the site. Furthermore, CORE also performed heating and air-conditioning maintenance on all surface buildings, including the office complex, the contractor trailers, the shop, the warehouse, and the outbuildings. ​ Other site services have included: washer and dryer maintenance; maintaining ice machines; local pickups and deliveries; hotshot services between sites and around the province; commissioning, maintaining and operating the over-23-kilometre overland belt system from K3 to K1 and K2; commissioning, maintaining and operating the Blair service hoist and two Koepe production hoists; running site warehousing; and operating and maintaining the water plant and ammonia chill plant. Again, CORE also performed some underground maintenance, such as: ground control work; installing a ‘catch’ system for previous generation bolts; operating drum miners and battery TAKING CARE OF YOU SINCE 2002 2 miles north on Hwy #8 | Moosomin, SK | info@rpmserviceltd.com 306-435-5800 www.rpmserviceltd.com SALES | SERVICE | PARTS MARCH 2024

RkJQdWJsaXNoZXIy OTYzNTg=