The facility is now being delivered utilizing an Integrated Project Delivery (IPD) framework, by a close-knit and collaborative team that includes the architect, the electrical, structural, mechanical and civil engineers, the contractor, and various partners such pool mechanical, electrical, steel and flooring subtrades, and the Town of Drayton. Representatives from each project met every week throughout the design process, and they continue to meet every week throughout construction. The result has been an exceptionally smooth delivery process.